摘 要

辽宁省铁法市大平五矿煤矿是一座未建成的新型矿井,通过对其钻孔资料的详细分析,初步探明该地区煤炭工业储量超过3.1亿吨;整个井田含有两层煤,其中上层煤为厚煤层,厚度达18米。通过对其水文、地质资料的精查,最终确定在该矿区建成一座年产180万吨的大型矿井。

针对该矿区煤层少、煤层厚度大、煤层间距及煤层倾角小的特点,最终采用在我国已经比较成熟的长壁开采法,采用分层分采的采煤方法;贯彻执行国家关于大型煤矿的建井方针,采用综合机械化采煤工艺。尝试采用最新的煤矿开采经验,用矸石填充采空区,使矸石基本不运出地面,生产系统大大简化,采用单轨吊辅助运输一条龙,从井口直达工作面,同时实现了综采与综掘同步发展,生产效率大幅提高的同时,重点研究高产高效矿井的开拓部署与巷道布置系统的优化,简化巷道布置,优化采区及工作面参数,对煤层采取集中开拓,集中准备、集中回采的关键技术,大幅度降低岩巷掘进率,多开煤巷,减少出矸率 ;既是减少污染的一项有力措施,又简化了生产系统,有利于高产高效集中化开采。

关健词:长壁开采 ;分层分采 ;矸石填充 ;高产高效

曹野:铁法大平五矿180万吨/年新井设计

The new well design for Dapingfive of 1.8 million tons

per year

Abstract

The Daping colliery of Tiefa city of Liaoning Province is a new-type mine not that haven't build up, through detailed to analyse, verify coal commercial reserves in this area exceed 310 to it.500 million tons;The field of the whole well contains two storeys of coal, among them the upper strata coal is thick coal seams, the thickness is up to18 meters.Through scrutinizing to its hydrology, geological materials , confirm finally that builds up a large-scale mine which produces 1,800,000 tons per year on this mining area.Direct this mining area coal seam little, coal seam thickness heavy , little characteristic , interval of coal seam and inclination of coal seam against, adopt mining methods;In high yield , adopt and synthesize the mechanized craft of mining.Try to adopt the latest colliery to exploit experience, pack and adopt the empty district with the waste rock, make the waste rock not transport the ground basically, the production system is simplified greatly, adopt the mionorail transportation, from well head directly working range, realize comprehensive to adopt with comprehensive to is it develop in step to dig at the same time, while the experience that production efficiency improve by a wide margin, key research high yield high-efficient open-up of mine dispose with the tunnel assigning systematic optimization, simplify the tunnel to fix up, optimize the exploiting field and working range parameter, is adopted and concentrates on opening up the coal seam , concentrate preparation , key technology of concentrating back production, reduce the tunnelling rate of the rock lane by a large margin , open more coal lanes, reduce out the gangue rate;It is a effective measure of reducing pollution, simplify the production system again, help the high-efficient focis of high yield to exploit.Key words:Longwall mining;Sliling mining;Packed by the waste rock in goaf;High

辽宁工程技术大学毕业设计

porduce high efficting

第二篇:采矿工程毕业设计

只要记分牌上的时间还跳动,就不能轻言放弃。目录

前言 1 1 矿区概述及井田特征 2 1.1 概述 2 1.1.1 矿区的地理位置及行政隶属关系 2 1.1.2 地形、地貌、交通等情况 2 1.1.3 气候地震等情况 3 1.2 井田及其附近的地质特征 3 1.2.1 井田的地层层位关系及地质构造 3 1.2.2 含煤系及地层特征 4 1.2.3 水文地质 5 1.3 煤质及煤层特征 5 1.3.1 井田内煤层及埋藏条件 5 1.3.2 煤层的含瓦斯性、自燃性、爆炸性 7 1.3.3 井田的勘探程度及进一步勘探要求 7 2 井田境界及储量 8 2.1 井田境界 8 2.1.1 井田范围 8 2.1.2 边界煤柱留设 8 2.1.3工业广场保护煤柱留设 8 2.1.4 边界的合理性 9 2.2 井田的储量 9 2.2.1 井田储量的计算原则 9 2.2.2 矿井工业储量 10 3 矿井的年产量、服务年限及一般工作制度 12 3.1 矿井年产量及服务年限 12 3.1.1 矿井的年产量 12 3.1.2 服务年限 12 3.1.3 矿井的增产期和减产期 产量增加的可能性 13 3.2 矿井的工作制度 13 4 井田开拓 14 4.1 井筒形式、位置和数目的确定 14 4.1.1 井筒形式的确定 14 4.1.2 井筒位置及数目的确定 15 4.2 开采水平的设计 19 4.2.1 水平划分的原则 19 4.2.2 开采水平的划分 20 4.2.3 设计水平储量及服务年限 23 4.2.4 设计水平的巷道布置 23 4.2.5 大巷的位置、数目、用途和规格 23 4.3 采区划分及开采顺序 24 4.3.1 采区形式及尺寸的确定 24 4.3.2 开采顺序 25 4.4 开采水平井底车场形式的选择 26 4.4.1 开采水平井底车场选择的依据 26 4.4.2 井底车场主要硐室 27 4.5 开拓系统综述 30 4.5.1 系统概况 30 4.5.2 移交生产时井巷的开凿位置、初期工程量 31 5 采准巷道布置 33 5.1 设计采区的地质概况及煤层特征 33 5.1.1 采区概况 33 5.1.2 煤层地质特征及工业储量 33 5.1.3 采区生产能力及服务年限 33 5.2 采区形式、采区主要参数的确定 34 5.2.1 采区形式 34 5.2.2 采区上山数目、位置及用途 34 5.2.3 区段划分 34 5.3 采区车场及硐室 35 5.3.1 车场形式 35 5.3.2 采区煤仓 35 5.4 采准系统、通风系统、运输系统 36 5.4.1 采准系统 36 5.4.2 通风系统 36 5.4.3 运输系统 36 5.5 采区开采顺序 36 5.6 采区巷道断面 37 6 采煤方法 39 6.1 采煤方法的选择 39 6.1.1 选择的要求 39 6.1.2 采煤方法 39 6.2 开采技术条件 39 6.3 工作面长度的确定 40 6.3.1 按通风能力确定工作面长度 40 6.3.2 根据采煤机能力确定工作面长度 41 6.3.3 按刮板输送机能力校验工作面长度 6.4 采煤机械选择和回采工艺确定 42 6.4.1 采煤机械的选择 42 6.4.2 配套设备选型 44 6.4.3 回采工艺方式的确定 44 6.5 循环方式选择及循环图表的编制 47 6.5.1 确定循环方式 47 6.5.2 劳动组织表 48 6.5.3 机电设备表 49 6.5.4 技术经济指标表 50 7 建井工期及开采计划 51

7.1 建井工期及施工组织 51 7.1.1 建井工期 51 7.1.2 工程排队及施工组织排队 52 7.2 开采计划 53 7.2.1 开采顺序及配产原则 53 7.2.2 开采计划 53 8 矿井通风 55 8.1 概述 55 8.2 矿井通风系统的选择 55 8.2.1 通风方式的选择 56 8.2.2 通风方法的选择 57 8.3 矿井风量的计算与风量分配 57 8.3.1 矿井总进风量 57 8.3.2 回采工作面所需风量的计算 58 8.3.3 掘进工作面所需风量 59 8.3.4 硐室所需风量的∑Qd的计算 60 8.3.5 其他巷道所需风量 61 8.3.6 风量的分配[17] 62 8.4 矿井总风压及等积孔的计算 62 8.4.1 计算原则 62 8.4.2 计算方法 64 8.4.3 计算等积孔 65 8.5 通风设备的选择 66 8.5.1 矿井主要扇风机选型计算 66 8.5.2 电动机选型计算 68 8.5.3 耗电量 68 8.6 灾害防治综述[13] 69 8.6.1 井底火灾及煤层自然发火的防治措施 69 8.6.2 预防煤尘爆炸措施 70 8.6.3 预防瓦斯爆炸的措施 70 8.6.4 避灾路线 70 9 矿井运输与提升 71 9.1 概述 71 9.2 采区运输设备的选择 71 9.2.1 采区运输上山皮带的选择 71 9.2.2 采区轨道上山运输设备的选择 72 9.2.3 运输顺槽转载机和皮带机选择 72 9.2.4 回风顺槽中运输设备的选择 73 9.2.5 工作面刮板输送机的选择 73 9.3 主要巷道运输设备的选择 74 9.4 提升 74 9.4.1 提升系统的合理确定 74 9.4.2 主井提升设备的选择 75 9.4.3 副井提升设备的选择 76 10 矿井排水 77 10.1 矿井涌水 77 10.1.1 概述 77 10.1.2 矿山技术条件 78 10.2 排水设备的选型计算 78 10.2.1 水泵选型 78 10.3 水泵房的设计 80 10.3.1 水泵房支护方式和起重设备 80 10.3.2 水泵房的位置 80 10.3.3 水泵房规格尺寸的计算 80 10.4 水仓设计 81 10.4.1 水仓的位置及作用 81 10.4.2 水仓容量计算 81 11 技术经济指标 83 11.1 全矿人员编制 83 11.1.1 井下工人定员 83 11.1.2 井上工人定员 83 11.1.3 管理人员 83 11.1.4 全矿人员 84 11.2 劳动生产率 84 11.2.1 采煤工效 84 11.2.2 井下工效 84 11.2.3 生产工效 84 11.2.4 全员工效 84 11.3 成本 85 11.4 全矿主要技术经济指标 86 结论 92 参考文献 93 附录A 94 附录B 97 前言

中国是世界最大产煤国

煤炭在中国经济社会发展中占有极重要的地位 煤炭是工业的粮食 我国一次能量消费中 煤炭占75%以上 煤炭发展的快慢

将直接关系到国计民生 作为采矿专业的一名学生

我很荣幸能够为祖国煤炭事业尽一份力

毕业设计是毕业生把大学所学专业理论知识和实践相结合的重要环节 使所学知识一体化

是我们踏入工作岗位的过度环节 设计过程中的所学知识很可能被直接带到马上的工作岗位上 所以显得尤为重要

学生通过设计能够全面系统的运用和巩固所学的知识 掌握矿井设计的方法、步骤及内容

培养实事求是、理论联系实际的工作作风和严谨的工作态度 培养自己的科学研究能力

提高了编写技术文件和运算的能力

同时也提高了计算机应用能力及其他方面的能力

该说明书为刘官屯矿0.90Mt/a井田初步设计说明书 在所收集地质材料的前提下 由指导教师给予指导

并合理运用平时及课堂上积累的知识 查找有关资料

力求设计出一个高产、高效、安全的现代化矿井

本设计说明书从矿井的开拓、开采、运输、通风、提升及工作面的采煤方法等各个环节进行了详细的叙述

并进行了技术和经济比较 论述了本设计的合理性 完成了毕业设计要求的内容 同时说明书图文并茂

使设计的内容更容易被理解和接受 在设计过程中

得到了指导老师的详细指导和同学的悉心帮助 在此表示感谢

由于设计时间和本人能力有限 难免有错误和疏漏之处 望老师给予批评指正矿区概述及井田特征 1.1 概述

1.1.1 矿区的地理位置及行政隶属关系

矿区位于唐山市东北约13km处的荆各庄村附近在开平煤田凤山西北侧 矿井走向长5km 倾斜长2.2km 井田面积11km2 南与马家沟矿业公司相距6km 中间有陡河相隔

北与陡河电厂相距3.5km 行政属开平区管辖

1.1.2 地形、地貌、交通等情况

1)地形地貌

为一平坦的冲积平原 北部山区为燕山山脉的余脉 井田北、东、南三面被低山包围

颇有山前扇状地景观 井田地面标高-100m

2)交通

该矿区的交通十分方便

铁路:一条通往用煤大户陡河电厂的专用线

并与吕陡线在井田上方交汇;另一条经马家沟矿业公司与老京山线的开平站相联 公路:北距10km与京沈高速公路、102国道相联 南距7km经开平与205国道、津秦高速公路相联 形成了比较完整的交通网 四通八达

井田内共有8个自然村 主要从事农业

除东新庄外其它7个村庄已搬迁完毕

图1-1 刘官屯矿交通位置图

Fig.1-1 Liuguantun Mining traffic and location

3)水文

本区东南的陡河 发源于北部山地 下游集入石榴河 向南流入渤海 主流全长100km 河水终年不固 不冻

在双桥村一带有水库

水库大坝距井田东端最近距离2.2km 陡河最高水位+219.5m 低于地面标高40m左右 冬季水位介于+216~+217m

1.1.3 气候地震等情况

本区系于半大陆性气候 夏季炎热多雨

多东南风;冬季严寒凛冽 秋冬多西北风

雨季集中在七、八、九三个月 年平均降雨量648.8毫升 最高气温38.50C 最低气温-22.6℃ 年平均气温10.6℃

冻结期由11月二旬至次年3月上旬 冻结深0.66m 地震烈度六级

1.2 井田及其附近的地质特征

1.2.1 井田的地层层位关系及地质构造

开平煤田位于燕山南麓

在大地构造上位于中朝地台燕山沉降带的东南侧

燕山南麓煤田在地质力学体系上处于天山~阴山纬向构造带、新华夏系构造带和祁吕~贺兰山山字形的三个巨型构造体系的交汇部位 开平煤田受新华夏构造体系的影响 以一系列NNE向的褶曲及逆断层组成

北部受纬向构造的影响逐渐向南弯转成走向近东西向 煤系地层由石炭系中统唐山组

上统开平组、赵各庄组及下二叠系大苗庄组、唐家庄组等组成 岩性以砂岩、泥岩为主

基底地层为中奥陶系马家沟组石灰岩 分布于煤田周边地带 与煤系地层呈不整合接触 见井田地质特征表1-1 煤田向南倾伏

其南部界限可能跨过宝坻~奔城大断层伸入另一个二级构造单元--华北断陷 经钻口和电测曲线对比推断 本区主要断层共有2条 分别为F1 和F2 区内尚未发现有大面积岩浆活动 所见分布于煤田西侧和南侧

区内未发现区域变质或侵入变质现象

说明:据2001全国地层委员会和2004国际地层委员会发布的时代划分方案 石炭纪二分 二叠纪三分

但为了与矿上其他资料吻合方便起见 本次仍沿用旧的时代划分方案

本井田西部以I号勘探线和F1断层为界 东部以VI号勘探线为界 北部以-300m等高线为界 南部以-750等高线

井田内赋存有9、12-2号两个可采煤层

表1-1 井田地质特征表

Tab.1-1 Well field geological feature table

年代

厚度/m

新生界 第四系

Q

~~~~~~不整合~~~~~~

洼里组

0~890

界 二叠系

上统

P22

2800

P21

古冶组

346

下统

P12

唐家庄组

180

P11

大苗庄组

石 炭 系 上统 C32 赵各庄组 74

C31 开平组 70

中统 C2 唐山组

-------平行不整合------马家沟组 65 下 古 生 界 奥 陶 系 中统 O2 345

下统 O12 亮甲山组 115

O11

冶里组 203 寒 武 系 上统 ?33 凤山组 68

?32 长山组 48

?31 崮山组 82

中统 ?2 张夏组 120

下统 ?12 馒头组 150

?11 景儿峪组 263 元 古 界 震

上统

Z2W

迷雾山组

1200

Z2Y

杨庄组

400

下统

Z1K

高于庄组

600

Z1T+H

大红峪黄崖关组

~~~~~~不整合~~~~~~

五台群

450

太古界

前震旦

Ar

1.2.2 含煤系及地层特征

开平煤田构造形式以褶皱为主 线型排列比较明显

向斜背斜多呈相间平行排列

区内由西至东有:蓟玉向斜及其两侧的窝洛沽向斜、丰登坞背斜、车轴山向斜、卑子院背斜、弯道山~西缸窑向斜、凤山~缸窑背斜、开平向斜 本设计的十组煤分四个分层 走向中部厚

沿走向往两侧逐渐变薄 但从钻孔看 变化不大

整个十组煤厚度均匀 从全矿井看

煤层角度东部较小 西部边界偏大 深部角度小 浅部角度大

1)表土层及风化层的深度

矿井田内地势平坦 为第四系冲积层所覆盖 冲 积层较厚

井田浅部以风积细粉砂岩为主 颗粒细而均匀

表土层厚度平均在100m 且有流沙

2)煤层总数及可采层数

本区煤层岩性变化不大 煤层结构相对简单 有少量夹矸 共含十一个煤组

本设计的十组煤全区发育 9、12-2均为可采煤层

1.2.3 水文地质

荆东四矿的水文地质条件属一般型 有八个含水层 自下而上分别为:

1)奥陶系石灰岩岩溶裂隙承压含水层(Ⅰ)

2)K2~K6砂岩裂隙承压含水层(Ⅱ)

3)K6~煤12砂岩裂隙承压含水层(Ⅲ)

4)煤9~煤7砂岩裂隙承压含水层(Ⅳ)

5)煤5以上砂岩裂隙承压含水层(Ⅴ)

6)风化带裂隙、孔隙承压含水层(Ⅵ)

7)第四系底部卵石孔隙承压含水层(Ⅶ)

8)第四系中上部砂卵砾孔隙承压和孔隙潜水含水层(Ⅷ)

其中与矿井生产较密切的为Ⅰ、Ⅳ、Ⅶ

全矿预测涌水量:

最大涌水量 419.6 m3/h

正常涌水量 256.3 m3/h 1.3 煤质及煤层特征

1.3.1 井田内煤层及埋藏条件

煤层走向主体为东西走向 整体近似于长方形 煤层赋存比较稳定 全区发育

平均倾角为14°左右 可采煤层间距见表1-2

表 1-2 煤层间距见表

Tab.1-2 Seam pitch table

煤层

平均厚度(m)

煤层间距(m)

12-2 3

煤层赋存状态十煤组共分9、12-2分层 全区发育 见煤层柱状图 如图1-2

图1-2 综合柱状图

Fig.1-2 Synthesis column map

本区煤层中夹石在井田中部最薄 往南北两翼逐渐变厚 沿倾向方向变化小

沿走向方向向南北变化稍大 本组地层一般厚度72.60m 以粉砂岩为主 粘土岩含量减少

各种岩石所占的百分比为:粘土岩10.1% 粉砂岩类占52.6% 砂岩类占31.4% 石灰岩占2.9%

岩相组合上为浅海相薄层泥质碳酸盐岩和泻湖海湾相粉砂岩及砂岩沉积物的交替沉积 煤的容重见表1-3

表 1-3 煤的容重

Tab.1-3 Bulk density of coal

容重

最小

最大

平均

t/m3

1.19

1.46

1.30

本组内赋存三层石灰岩 由下而上命名为K4、K5、K6 其中K5石灰岩为深灰色泥质生物碎屑岩 时而接近钙质粘土岩

特点是含灰白色的动物介壳 富集成层

与深灰色泥质灰岩交替成细带状 形成明显的水平层理和水平波状层理 极易区别于其它石灰岩 厚度薄但比较稳定

本组比较突出的特点是出现了含煤沉积 是典型的海陆交互相沉积序列

井田内各煤层的伪顶多为薄层泥岩 直接顶一般为粘土岩或粉砂岩 底板多为粉砂岩次之 区内虽然岩性变化大 但有一定规律 即由东往西

由下向上岩性逐渐由细变粗 北部和中部较稳定 各类砂岩层理不甚发育 破碎易风化

具有较强的膨胀性 遇水后即软化

断裂带附近层间滑动发育 其内的巷道围岩不稳定 易冒落变形

位于煤层间的巷道有不同程度的移动和破坏

1.3.2 煤层的含瓦斯性、自燃性、爆炸性

本井田煤层瓦斯含量均很低 属低沼矿井 据化验资料

瓦斯绝对涌出量为:1.27~5.56m3/min平均4.75 m3/min 相对涌出量为:0.39~3.38m3/t平均1.17 m3/t 煤尘爆炸指数为:为38.42%~64.20%;本区由于煤燃点低 易自燃发火

煤尘试验结果为火焰长度40mm 岩粉量55% 具有爆炸性

自燃发火期为3-6个月

1.3.3 井田的勘探程度及进一步勘探要求

目前

勘探程度已达到精查

确定了高级储量为50%以上 但为了满足以后生产要求 应提高一水平的勘探程度 使高级储量达到70%以上井田境界及储量 2.1 井田境界 2.1.1 井田范围

本井田西部以I号勘探线和F1断层为界 东部以VI号勘探线为界 北部以-300等高线为界 南部以-750等高线为界

井田内赋存有9、12-2号两个可采煤层

2.1.2 边界煤柱留设

矿井走向长5km 倾斜长2.2km 井田面积11km2 井田内地形比较完整

井田四周依据相关规定和安全考虑分别留设20m的边界煤柱 由于井田西面和南面为断层所包围

故西部和南部的井田边界即为断层保护煤柱和井田境界保护煤柱 按《煤矿安全规程》[2]规定 边界煤柱的留法及尺寸:

1)井田边界煤柱留30m;

2)阶段煤柱斜长60m 若在两阶段留设

则上下阶段各留30m;

3)断层煤柱每侧各为20m;

4)采区边界煤柱留10m

根据参考《煤炭工业设计规范》[1]和《矿井安全规程》[2]的相关数据要求和规定 本井田所留的各种保护煤柱均合理 符合规定

2.1.3工业广场保护煤柱留设

由《设计规范》规定:工业场地占地面积:45-90万t/年 1.2~1.3公顷/10万t;120-180万t/年 0.9~1.0公顷/10万t;240-300万t/年 0.7~0.8公顷/10万t 400-600万t/年

0.45-0.6公顷/10万t 本矿井设计年产90万t 则工业广场占地面积为S=(90/10)*1.2=10.8公顷=108000m2 则工业广场设计成长380m 宽290m的矩形

在确定地面保护面积后 用移动角圈定煤柱范围

工业场地地面受保护面积应包括保护对象及宽度15m的围护带

在工业场地内的井筒 圈定保护煤柱时

地面受保护对象应包括绞车房、井口房或通风机房、风道等 围护带宽度为15m

2.1.4 边界的合理性

在本井田的划分中 充分的利用到现有条件 既降低了煤柱的损失

也减少了开采技术上的困难 使工作面的部署较为简易 同时

本井田的划分使储量与生产相适应

矿井生产能力与煤层赋存条件、开采技术装备条件相适应 井田有合理的尺寸

条带尺寸满足《煤炭工业设计规范》[1]的要求 走向长度划分合理

使矿井的开采有足够的储量和足够的服务年限 避免矿井生产接替紧张

根据《煤炭工业设计规范》[1]的规定 采区开采顺序必须遵守先近后远 逐步向边界扩展的原则 并应符合下列规定:

1)首采采区应布置在构造简单 储量可靠

开采条件好的块段

并宜靠近工业广场保护煤柱边界线

2)开采煤层群时 采区宜集中或分组布置 有煤和瓦斯突出的危险煤层

突然涌水威胁的煤层或煤层间距大的煤层 单独布置采区

3)开采多种煤类的煤层 应合理搭配开采

综上所述

矿井首采区定在靠近工业广场的西北部 采区储量丰富

有利于运输的集中和减少巷道的开拓费用 所以井田划分是合理的 因此 综上来看

本井田的划分是合理的

也就是说本井田设计的边界是合理的

2.2 井田的储量

2.2.1 井田储量的计算原则

1)按照地下实际埋藏的煤炭储量计算 不考虑开采、选矿及加工时的损失;

2)储量计算的最大垂深与勘探深度一致 对于大、中型矿井 一般不超过1000m;

3)精查阶段的煤炭储量计算范围 应与所划定的井田边界范围相一致;

4)凡是分水平开采的井田 在计算储量时

也应该分水平计算储量;

5)由于某种技术条件的限制不能采出的煤炭 如在铁路、大河流、重要建筑物等两侧的保安煤柱 要分别计算储量;

6)煤层倾角不大于15度时

可用煤层的伪厚度和水平投影面积计算储量;

7)煤层中所夹的大于0.05m厚的高灰煤(夹矸)不参与储量的计算;

8)参与储量计算的各煤层原煤干燥时的灰分不大于40%

2.2.2 矿井工业储量

矿井的工业储量:勘探地质报告中提供的能利用储量中的A、B、C三级储量 本井田的工业储量的计算:

1)工业储量

井田煤层埋藏深度为-300~--750标高之间

工业储量为:

Eg=11000000×(4+3)×1.3/cos14=103195876.3t

2)井田永久煤柱

井田永久煤柱损失包括铁路、井田境界、断层防护煤柱 和浅部矿井水下开采防水煤柱

a断层煤柱损失

断层的两侧各留20m的保护煤柱 此断层的面积为1188×40=47520m2

故此断层保护煤柱损失为:47520×(3+4)×1.3=43.2万t

b井田境界煤柱损失

井田境界留设30m的边界煤柱

总长为13528m;井田境界保护煤柱所占面积为405840m2 经计算

故境界保护煤柱损失为:405840×7×1.3=369.31万t

P1=43.2+369.31=412.51万t

3)矿井设计储量

Es= Eg-P1=10319.58-412.51=9907.07万t

4)采区回采率

矿井采区回采率

应该符合下列规定:厚煤层不应小于75﹪;中厚煤层不应小于80﹪;薄煤层不应小于85﹪ 全矿采区回采率按下式计算:

==0.77

5)矿井设计可采储量

Ek=(Es-Pz)×(2-1)

式中

Ek--设计可采储量

Es--井田设计储量

Pz--煤柱损失

--采区平均回采率

煤柱损失Pz主要包括工业广场压煤、阶段间煤柱等

工业广场压煤Y

9煤层压煤量=(828+905)×683÷2×4×1.3=307.75万t

12-2煤层压煤量=(840+926)×704÷2×3×1.3=242.44万t

Y=307.75+242.44=550.19万t

阶段煤柱=(2851 +1861)×(4+3)×1.3÷cos14= 4.42 t

Pz=550.19+4.42=554.61

设计可采储量:Ek =(Es-Pz)

=(9907.07-554.61)0.77= 7201.4万t 矿井的年产量、服务年限及一般工作制度 3.1 矿井年产量及服务年限 3.1.1 矿井的年产量

矿井的年产量(生产能力)确定的合理与否

对保证矿井能否迅速投产、达产和产生效益至关重要

而矿井生产能力与井田地质构造、水文地质条件、煤炭储量及质量、煤层赋存条件、建井条件、采掘机械化装备水平及市场销售量等许多因素有关 经分析比较

设计矿井的生产能力确定为0.9 Mt/a 合理可行 理由如下:

1)储量丰富

煤炭储量是决定矿井生产能力的主要因素之一 本井田内可采的煤层达到2层 保有工业储量为1.03亿t 按照0.9Mt/a的生产能力 能够满足矿井服务年限的要求

而且投入少、效率高、成本低、效益好

2)开采技术条件好

本井田煤层赋存稳定 井田面积大 煤层埋藏适中 倾角小 结构简单

水文地质条件及地质构造简单 煤层结构单一

适宜综合机械化开采 可采煤层均为厚煤层

3)建井及外运条件

本井田内良好的煤层赋存条件为提高建井速度、缩短建井工期提供了良好的地质条件 本井田内交通十分便利

刘官屯矿井田大部位于河北省丰南市境内 地处交通要塞

是华北通往东北的咽喉地带

京沈、京秦、大秦三大铁路横贯全境 津山、京沈干线km横跨东西 东有秦皇岛港 西邻天津港

新建的唐山港位于津秦两港之间 境内铁路公路交织成网 交通发达

为煤炭资源的运输提供了便利条件

综上所述

由于矿井优越的条件及外部运输条件

矿井的生产能力为90万t是可行的、合理的

并且符合《煤矿安全规程》和《设计规范》的相关要求

3.1.2 服务年限

矿井保有工业储量1.03亿t 设计可采储量7201.4万t 按0.9Mt/a的生产能力 考虑1.4的储量备用系数 则

式中: K--矿井备用系数 取1.4

A--矿井生产能力 0.9Mt/a

Zk--矿井可采储量 万t

P--矿井服务年限 年

代入数据得

P= 7201.4 /(90×1.4)=57.15年

因为服务年限大于45年 所以符合《设计规范》要求

3.1.3 矿井的增产期和减产期 产量增加的可能性

建井后产量出现变化 其可能性为:

3-1)(1)地质条件勘探存在一定的误差 有可能出现新的断层

2)由于国民经济发展对煤炭的需求变化 导致矿井产量增减

3)矿井的各个生产环节有一定的储备能力 矿井投产后

迅速突破设计能力 提高了工作面生产能力

4)工作面的回采率提高 导致在相同的条件下 矿井服务年限增加

5)采区地质构造简单 储量可靠

因此投产后有可靠的储量及较好的开采条件

3.2 矿井的工作制度

结合本矿井煤层条件、储量情况、以及达成产量所需要的时间;同时考虑设备检修以及工人工作时间等实际的因素

在满足《煤矿安全规程》的条件之下 本矿井工作制度安排如下:

矿井工作日为330天

本矿井工作制度采用“三八”制 两班采煤 一班检修

日提升工作时间为16小时井田开拓

井田开拓方式应该通过对矿井设计生产能力 地形地貌条件 井田地质条件 煤层赋存条件

开采技术及装备设施等综合因素进行方案比较以及系统优化之后确定 因此

在解决井田开拓问题时 应遵循以下原则:

1)贯彻执行有关煤炭工业的技术政策

为多出煤、早出煤、出好煤、投资少、成本低效率高创造条件 要使生产系统完善、有效、可靠

在保证生产可高和安全的条件下减少开拓工程量;尤其是初期建设工程量 节约基建投资 加快矿井建设

2)合理集中开拓部署 简化生产系统 避免生产分散

为集中生产创造条件

3)合理开发国家资源 减少煤炭损失

4)必须贯彻执行有关煤矿安全生产的有关规定 要建立完善的通风系统 创造良好的生产条件 减少巷道维护量

使主要巷道经常保持良好状态

5)要适应当前国家的技术水平和设备供应情况

并为采用新技术、新工艺、发展采煤机械化、综合机械化、自动化创造条件

6)根据用户需要

应照顾到不同煤质、煤种的煤层分别开采 以及其他有益矿物的综合开采

4.1 井筒形式、位置和数目的确定 4.1.1 井筒形式的确定

井筒是联系地面与井下的咽喉 是全矿的枢纽

井筒选择应综合考虑建井期限 基建投资

矿井劳动生产率及煤的生产成本 并结合开拓的具体条件选择井筒

矿井开拓 就其井筒形式来说

一般有以下几种形式:平硐、斜井、立井和混合式 下面就几种形式进行技术分析 然后进行确定采用哪种开拓方式

平硐:一般就是适合于煤层埋藏较浅 而且要有适合于开掘平硐的高地势 例如山地或丘陵 也就是要有高于工业广场以上具有一定煤炭储量 本井田地势比较平缓

高低地的最大高差也不过几十米 而且煤层埋藏较深 很显然

利用平硐开拓对于本井田来说是没有可行性的

斜井:利用斜井开拓首先要求煤层埋藏较浅、倾角较大的倾斜煤层 且当地地表冲积层较厚 利用竖井开拓困难时 即便是煤层埋藏较深

不惜打较长的斜井井峒的条件下才可能使用 而本井田的条件却不尽如此

全部的可采煤层均赋存于-50m以下 最深达-500m 这样一来

如果按照皮带斜井设计时 倾角不超过17度的话

此时斜井的井筒长度将是很大的 太长的斜井提升几乎是不可能的 而且工程量也是非常巨大的

跟着相关的维护和运输等费用也会大幅度的增加

以上种种因素决定了本井田使用斜井开拓也是不可行的

立井:适用于开采煤层埋藏较深且地表附近冲积层不厚的情况 而且越是这种情况就越显示出立井的优越性

混合式:对于本矿井来说 由于利用平硐和斜井都是不可行的 所以混合式也就不予考虑

本井田的煤层埋藏较深 地表附近的冲积层又比较薄 它对井筒的开凿将不会造成影响 而且立井开拓的一大好处就是 如果基岩赋存较稳定时 开凿以后

其维护费用几乎为零 本井田采用立井开拓时 对于煤炭的提升也较合适

根据《煤炭工业设计规范》[1]规定:煤层埋藏较深、表土层较厚、水文地质条件复杂及主要可采煤层赋存比较稳定.储量比较丰富等特点.本设计采用立井开拓. 4.1.2 井筒位置及数目的确定

1)井筒的数目

a 根据本矿区煤层的埋藏的具体条件 各井筒均采用立井

b主井、副井、风井各一个(见图4-

1、4-

2、4-3)

c井筒参数 表4-1井筒参数

Tab.4-7 Well chamber parameter 井筒名称

用途 井筒长度/m 提升方法

断面尺寸

直径/m 净断面积/㎡

主井 提升煤炭

520 箕斗提升

5.5

23.75

副井

进风、进人、运料排矸

480 罐笼提升

7.0

34.46

风井

回风兼作

安全出口

200

6.0

28.30

该设计采用三个井筒的井田开拓方式:主井、副井、风井 通风方式为中央边界式通风

2)井筒的位置

选择井筒位置的原则:

a 有利于第一开采水平的开采 并兼顾其它水平

有利于井底车场的布置和主要运输大巷位置的选择 石门工程量小

b有利于首采采区不只在井筒附近的富煤块段 首采采区少迁村或不迁村

井田两翼储量基本平衡

c 井筒不易穿过厚表土层、厚含水层、断层破碎带、煤与瓦斯突出煤层或较弱岩层

d 工业广场应充分利用地形 有良好的工程地质条件 且避开高山 低洼地和采空区 不受滑坡和洪水威胁

e工业广场宜少占农田少压煤

f 水源 电源较近

矿井设在铁路专用线路短 道路布置合理点

便于布置工业场地的位置 主要是根据以下一些原则:

a有足够的场地

便于布置矿井地面生产系统及其工业建筑物和构筑物

b有较好的工程、水文地质条件

尽可能避开滑坡、崩岩、溶洞、流沙层等不良地段 这样既便于施工

又可以防止自然灾害的侵袭

c便于矿井供电、给水、运输

并使附近有便于建设居住区、排矸设施的地点

d避免井筒和工业场地遭受水患、井筒位置要高于当地最高洪水位

e充分利用地形、使地面生产系统 工业场地总平面布置及其地面运输合理 并尽可能是平整场地的工程量少

对井田开采有利的井筒位置 确定依据:

倾斜方向的位置:

从保护井筒和工业场地繁荣煤柱损失看 愈靠近浅部

煤柱的尺寸愈小;愈靠近深部 煤柱的损失愈大 因此

井筒沿倾斜方向位于井田中上

走向的位置

a)井筒沿井田走向的位置应在井田中央 当井田储量不均匀分布时 应在储量分布的中央

以次形成两翼储量比较均衡的双翼井田

应该避免井筒偏于一侧造成单翼开采的不利局面

b)井筒设在井田中央时 可以使沿井田走向运输工作量小

而井田偏于一侧的相应井下运输工作量比前者要大

c)井筒设在井田中央时 两翼分配产量比较均衡

两翼开采结束的时间比较接近

d)井筒设在井田中央时 两翼风量分配比较均衡 通风线路短 通风阻力小

综合考虑

主副井筒位置选在井田走向中央位置 位于倾向中上部

风井井口位置的选择:

风井井口位置的选择 应在满足通风要求的前提下 与提升井筒的贯通距离较短 并应利用各种煤柱

有条件时风井的井口也可以布置在煤层露头以后

综合考虑

本矿井的风井沿走向布置在井田的边界中部

图4-1主井断面图

Fig.4-1 Main shaft cross-section fig

主井净直径5.5m 提升容器为9t箕斗一对

采用Jkm4×4(Ⅱ)型多绳磨擦轮提升机 配JRZ170/49-16型绕线式异步电动机两台 每台1000KW 最大提升速度为7.38m/s 该提升设备担负本矿全部煤炭提升

图 4-2副井断面图

Fig.4-2 Auxiliary shaft cross-section fig

副井净直径7.0m 提升容器为一吨双层四车多绳罐笼一对(一宽一窄)采用Jk.25×4(Ⅱ)型多磨擦轮提升机 配JRZ500-12型绕线异步电动机两台 每台500KW 最大提升速度8.02m/s

副井每次提升或下放四辆重车时 另一侧必须配四辆空车

下放液压支架时其重量限制在10.5t以内(包括平板车重)另一侧必须配两辆重车

图4-3风井断面图

Fig.4-3Air shaft cross-section fig

风井位于井田上部边界中部 净直径6.0m用于排风 同时做为安全出口

4.2 开采水平的设计 4.2.1 水平划分的原则

确定原则:

1)根据《煤炭工业设计规范》规定:

(1)90万t的矿井第一水平服务年限不得小于20年 缓倾斜煤层的阶段垂高为200-350m;

(2)条件适宜的缓倾斜煤层 宜采用上下山开采相结合的方式;

(3)近水平多煤层开采 当层间距不大时 宜采用单一水平开拓

2)根据煤层赋存条件及地质构造

煤层的倾角不同对阶段高度的影响较大 本井田的属于缓倾斜煤层 其平均倾角为14°

煤层标高从-750m标高到-300m标高

根据《煤炭工业设计规范》规定缓倾斜煤层的阶段垂高为200~350m 故划分为两个阶段

再结合本井田的煤层标高差较小 阶段斜长较短的实际情况 宜采用单水平上下山开采

3)根据生产成本

阶段高度增大 全矿井水平数目减少 水平储量增加

分配到每t煤的折旧费减少

但阶段长度大会使一部分经营费相应增加

其中随着阶段增大而减少的费用有:井底车场及硐室、运输大巷、回风大巷、石门及采区车场掘进费、设备购置及安装费用等;相应增加的费用有:沿上山的运输费、通风费、提升费、倾斜巷道的维修费

此外还延长生产时间、增加初期投资

因此要针对矿井的具体条件提出几个方案进行经济技术比较 选择经济上合理的方案

4)根据水平接替关系

在上一水平减产前 新水平即作好准备

因此一个水平从投产到减产为止的时间 必须大于新水平的准备时间 正常情况下

大型矿井的准备时间要1.5~2年

井底车场、石门及主要运输大巷亦需要1.5~2年 延伸井筒需要1年

合计需要4~5年的时间

开拓延伸加上水平过渡需要7~9年 所以每个矿井在确定水平高度时

必须使开采时间大于开拓延伸加上水平过渡所需要的时间

根据《煤炭工业矿井设计规范》:当煤层倾角大于12度时 宜采用走向长壁采煤法

本矿井煤层倾角平均为14度 故采用走向长壁采煤法

4.2.2 开采水平的划分

根据本井田的实际情况 以及煤层赋存的条件

提出两个在技术上可行的方案 :

方案一:采用立井单水平上下山开采

总的来说

两个方案再在技术术上均可行 各有优缺点

需要通过经济比较 才能确定其优劣

首先对下阶段的巷道布置在技术上比较两方案的优缺点 详见表4-2

表4-2两种开拓方案的技术分析表

Tab.4-2 two kind of development plan technical analytical table

方案

方案一:采用立井单水平上下山开采

方案二:采用立井双水平加暗斜井上山开采

(1)开拓巷道工程量小 两阶段共用一组大巷和平巷 掘进率较低

(2)提升运输距离较短(3)保护煤柱损失少 可以提高回采率

(4)下山阶段辅助运输容易

(1)采准巷道施工容易 工艺简单

(2)对工作面通风有利 可以避免下行风带来的缺点 通风费用较少

(3)对于煤炭的回采有利

(4)延伸井筒的施工比较方便

(1)施工技术复杂 设备要求多

(2)掘进速度慢 掘进费用高(3)下山开采

工作面生产难度增加 排水困难

(4)顺槽内运输费用较高 生产费用较高

(5)两顺槽间风压差别较大 通风困难

(1)开拓巷道工程量大 增加准备时间

(2)提升能力小 动力消耗大 提升费用高

(3)风路长 风阻大 通风费用高

(4)暗斜井的维护较为困难 维护费用高

对于两个方案进行经济比较:

因两个方案划分的采区基本相同 所以采区上山的经济比较可以忽略不计 具体比较如下:

图4-4立井开拓方案一

Fig.4-4 vertical shaft development planNo.1

图4-5立井开拓方案二

Fig.4-5 Vertical shaft development plan No.2

表4-3案一 单水平上下山开采

Table 4-3 pioneering single-level downhill

项目

工程量

单价

费用

运输提升 万t

1520万t

0.669元/t

1016.8万元

排水 万m3

404.3万m3

0.1525元/m3

61.65万元

合计

1078.4万元

表4-4方案二:暗斜井延伸 两水平开采

Table 4-4 Option 2: Inclined Shaft extension the two levels of exploitation

名 称

掘 进 费 用

长度

(m)

费用

(元/m)

总费用

(万元)

运输暗

斜 井

922

3000

276.6

回风暗

斜 井

922

3000

276.6

井底车场

1100

3000

330

运输大巷

1269

3000

380.7

合计

1263.9万元

通过两个方案进行经济比较 很显而易见

方案二比方案一明显增加两条912m的暗斜井 以及增加相应的采准巷道 掘进费用明显高于方案一

而且相应的运煤、提升费用尚未计入表中 使得方案一的优势更加突出 所以方案一为最优方案

综上所述

本设计采用单水平上下山联合的方式

4.2.3 设计水平储量及服务年限

本井田设计水平为-580水平

第一阶段的设计可采储量为3900.5万t 设计水平的服务年限为34.1年

表4-5 水平储量及服务年限

Tab.4-5 Horizontal reserves and service life

水平序号

可采储量/万t

服务年限/年

第一阶段

3900.5

30.96

第二阶段

3300.9

26.19 4.2.4 设计水平的巷道布置

由于本井田煤层间距较近层间距<80m 故采用集中大巷布置 为便于维护

将大巷布置到12-2煤层底板岩层中 又由于设计中通风方式为边界式 所以采用两条大巷布置

大巷距煤层底板间距一般30m

大巷支护方式掘进时期及时支护采用锚杆支护 后期采用混凝土砌碹 巷道断面特征见图4-6

4.2.5 大巷的位置、数目、用途和规格

1)大巷的位置

选择大巷位置的原则:掘进量少 费用少 维护条件好 煤柱损失少

有利于通风和防火 运输方便

本矿井的可采煤层有两层

双轨大巷布置在12-2号煤层底板岩层的-580m水平处 距煤层底板30m

2)大巷的数目和用途

根据运输和通风条件 本矿井共布置一条双轨大巷

承担整个水平运煤、进风、运料、排水、排矸、行人等任务

3)大巷的规格

因为大巷的服务年限都较长 所以都采用锚喷支护 各大巷具体断面如下:

图 4-6 双轨大巷断面图

Fig.4-6 Transport the big lane sectional drawing

大巷运输方式采用矿车运输 轨型为18公斤/m 轨道大巷轨距600 mm 对大巷运输方式选择的依据是:

1)由于设计生产能力小 采用此种运输方式能满足要求

2)吨公里运输费较低

3)运输能力大 机动性强

随着运距和运量的变化可以增加列车数

4)矿车运煤可同时统一解决煤炭、矸石、物料和人员的运输问题

5)对巷道直线度要求不高 能适应长距离运输 4.3 采区划分及开采顺序 4.3.1 采区形式及尺寸的确定

根据井田地质情况 煤层赋存较稳定 煤层厚度在4左右 井田走向长度5km 井田内两条大的断层构造

以上条件很适合布置综合机械化采煤

而设计规范规定综采工作面双翼采区走向长度应超过1500~2000m 因此将井田共划分四个采区 其中一阶段两个上山采区 北一采区和北二采区 均为双翼采区

二阶段两个下上采区:南一采区 南二采区

表4-6 井田各采区技术特征表

Table 4-6 Mine technical characteristics of the mining area Table 采区

走向长度/m 倾斜长度/m 工业储量/万t 采煤方式 落煤方式 准备方式 N1 2416 1197 2869.2 走向长壁 综采

双翼上山采区 N2 1846 1038 1720.2 走向长壁 综采

双翼上山采区 S1 2281 756 2043.6 走向长壁 综采

双翼下山采区 S2 2226 904 1686.6 走向长壁 综采

双翼下山采区 合计 8769 3895 8319.6

4.3.2 开采顺序

合理的开采顺序是在考虑煤层采动影响的前提下 有步骤、有计划的按照一定的顺序进行 保证采区、工作面的正常接替 以保证安全、均衡、高效的生产 并且有利于提高技术经济指标

合理的开采顺序可以保证开采水平、采区、回采工作面的正常接替 保证矿井持续稳定生产 最大限度地采出煤炭资源

减少巷道掘进率及维护工程量;合理的集中生产 充分发挥设备能力 提高技术经济效益 便于防止灾害 保证生产安全可靠

根据《矿井设计规范》规定

新建矿井采区开采顺序必须遵循先近后远 逐步向井田边界扩展的前进式开采 多煤层开采时 一般先采上层

后采下层的下行式开采

还应厚、薄煤层合理搭配开采;开采有煤与瓦斯突出煤层时 应按开采保护层、抽放瓦斯及单独开采等技术措施要求 顺序开采

为保证均衡生产 一个采区开始减产

另一个采区即应投入生产 为此

必须准备好一个新的采区 所以

一个采区的服务年限应大于一个采区的开拓准备时间

由于双翼两个采区条件相近大巷长度又大致相等

所以采区开采顺序可任选一个先采 本设计开采顺序为:N1采区 S1采区 N2采区 S2采区

煤层间下行式 区段内后退式回采

4.4 开采水平井底车场形式的选择 4.4.1 开采水平井底车场选择的依据

井底车场是连接井筒和井下主要运输巷道的一组巷道和硐室的总称 是连接井下运输和提升的枢纽 是矿井生产的咽喉 因此

井底车场设计是否合理

直接影响着矿井的安全和生产

根据《矿井设计规范》规定

井底车场布置形式应根据大巷运输方式、通过井底车场的货载运量、井筒提升方式、井筒与主要运输大巷的相互位置、地面生产系统布置和井底车场巷道及主要硐室处围岩条件等因素 经技术经济比较确定

由于本设计中主井提升方式为箕斗提升 大巷采用矿车运输

井底车场与大巷距离较远且需用石门联系 从主副井井底车场到大巷均与石门联系 所以井底车场型式选为立式车场 如图4-7

1――主井

2――副井

3――井底煤仓

4――水仓

5――水泵房 6――中央变电所 7――清煤斜巷 图 4-7 井底车场示意图

Fig.4-7 Shaft station abridged general view cross-section distinction 4.4.2 井底车场主要硐室

根据《矿井设计规范》规定 井下硐室应根据设备安装尺寸进行布置 并应便于操作、检修和设备更换 符合防水、防火等安全要求 井下主要硐室位置的选择 应符合下列规定:

a应选择在稳定坚硬岩层中 应避开断层、破碎带、含水岩层;

b井下硐室不布置在煤与瓦斯突出危险煤层中和冲击地压煤层中

井底车场的主要硐室包括煤仓、箕斗装载硐室、中央变电所、中央水泵房及火药库

1)井底煤仓及装载硐室

井底煤仓位置应根据大巷运输方式、装载硐室位置、围岩条件及装载胶带机巷与装载硐室相互联系等因素比较确定

井底煤仓宜选用圆形直仓 井底煤仓的有效容量按下式计算:

(4-1)

式中:

Qmc--井底煤仓有效容量(t)

Amc--矿井日产量(t)

0.15~0.25--系数 大型矿井取大值 小型矿井取小值 本设计取0.15

则井底煤仓容量为:

Qmc=0.15×900000/330=410t

煤仓为圆形垂直煤仓 见图4-8

图4-8垂直煤仓结构图

Fig.4-8 The diagram of coal Depot

1--上部收口;2--仓身;3--下口漏斗及溜口闸门基础;4--溜口及闸门

2)中央变电所、中央水泵房和水仓

中央变电所和中央水泵房联合布置

以便使中央变电所向中央水泵房供电距离最短 一般布置在副井井筒与井底车场连接处附近当矿井突然发生火灾时 仍能继续供电、照明和排水 为便于设备的检修及运输 水泵房应靠近副井空车线一侧

水泵房与变电所之间用耐火材料砌筑隔墙 并设置铁板门为防止井下突然涌水淹没矿井 变电所与水泵房的底板标高应高出井筒与井底车场连接处巷道轨面标高0.5m 水泵房及变电所通往井底车场的通道应设置密闭门 水仓入口

一般设在空车线 井底车场标高最低处 确定水仓入口时 应注意水仓装满水

中央变电所和中央水泵房建成联合硐室 具体见图4-9:

图 4-9 中央变电所和中央水泵房联合硐室

Fig.4-9 Substation capacity and water pump house union booth

3)火药库

由于本矿井采用全部机械化采煤 所以相对用火药较少

选用储量较小的壁槽式火药库就可以满足井下正常工作的需要

库房与巷道的关系:

a库房距井筒、井底车场、主要运输巷道、主要硐室和影响全矿井大部分采区通风的风门的直线距离应不小于80m;

b库房距地面或上下巷道的直线距离不小于15m

根据本设计井底车场的实际位置 采用容重2400kg壁槽式标准爆破材料库 该材料库具有独立的通风系统

打一条通风钻孔直接与地面直接相连 火药库的具体结构见图4-10:

图 4-10 壁槽式爆破材料库

Fig.4-10 Blast material storage

序号

巷道名称

序号

巷道名称

轨道大巷 2

库房巷道

炸药壁槽

雷管壁槽

电气壁槽

消防器材

放炮工具室

发炮室

防火门 10

回风立眼

4.5 开拓系统综述 4.5.1 系统概况 1)开拓方式

本设计矿井采用“立井多水平、集中运输大巷、走向长壁相结合”的开拓方式 采用立井开拓 共3个井筒

主箕斗立井、副罐笼立井、边界风井 采用中央边界式通风方式

矿井开采水平在-580m标高位置 矿井正常生产时

一个采区一个综采工作面保证年产量

2)生产系统:

a 通风系统:由副井进风 主回风井回风

一采区通风路线是:副井 轨道石门 轨道大巷 采区轨道上山 区段轨道石门 区段运输平巷 工作面

区段回风平巷 区段回风石门 采区运输上山 回风大巷 最后由主回风井排出地面

火药库通风:副井入风 采用钻孔立眼回风

b 运煤系统:工作面落煤 区段运输平巷 区段运输石门 溜煤眼下溜 采区运输上山 采区煤仓 运输大巷 运输石门 井底煤仓

最后由主井箕斗提升至地面

c 运矸系统:掘进工作面 区段轨道平巷 采区回风石门 采区轨道上山 轨道大巷 副井 地面

d 运料运人系统:地面 副井 轨道大巷 采区轨道上山 区段回风石门 区段轨道平巷 直至工作面

e 排水系统:采掘工作面 区段平巷 区段轨道石门 采区轨道上山 轨道大巷 井底车场 水仓 副井 地面

4.5.2 移交生产时井巷的开凿位置、初期工程量

1)矿井移交生产时的标准

a 井上、下各生产系统基本完成 并能进行正常的安全的生产;

b “三个煤量”达到规定标准;

c 回采工作面长度一般不少于设计回采工作面长度的50﹪;

d 工业广场内的行政、公共设施基本完成;

e 居住区及其设施基本完成

根据以上标准确定井巷的开凿位置

2)移交生产时井巷开凿的位置

在矿井设计中

全矿年产量由一个综采工作面保证达产 移交生产时

运输上山、轨道上山已经掘进到开采位置

煤层运输平巷、回风平巷已掘完并通过区段石门与上山相连 然后掘开切眼 贯通上下顺槽

3)初期工程量

初期移交工程量是指移交时掘进的各类巷道硐室、井筒等为生产服务的设施的总的掘进体积

初期移交开拓工程量见表4-7:

表4-7交初期工程量表

Tab.4-7 Erealy transfer engineering amount table

名称

长度/m

掘进断面面积/ m2

掘进体积/

主井

520

23.75

12350

副井

480

34.46

16540..8

风井

200

28.30

5660

井底车场

1100

18.4 20240 主要运输石门 130 16.9 2197 主要轨道石门 130 16.9 2197 运输大巷 1600 16.9 27040 运输上山 1170 16.9 19773 轨道上山 1170 16.9 19773 轨道石门 80 16.9 1352 回风石门 259 16.9 4377.1 运输顺槽 1430 16.1 24167 回风顺槽 1430 12.6 18018 回风大巷 1170 16.4 19188 开切眼 180

12.6

2268

总计

195320.9 采准巷道布置

5.1 设计采区的地质概况及煤层特征 5.1.1 采区概况

设计采区为一采区 该采区位于井田西翼 西至井田勘探线

东部边界到工业广场保护煤柱线 大巷布置在-580水平采区平均走向长2416m 倾斜长1256m 采区内共发育两个个可采煤层 煤厚分别为3m、4m 煤层赋存简单

无断层及火成岩侵入等地质构造 煤层倾角平均为14度 煤变质程度高 煤质好

绝对涌出量为10.5m3/min 发火期短

煤层直接顶较厚并且软弱

5.1.2 煤层地质特征及工业储量

一采区做为首采区 是上山开采 采区开采两层煤

煤层平均倾角为14° 属于缓倾斜煤层 采区内地质构造简单 无断层 煤质较好

水分含量0.56~15.54% 瓦斯相对涌出量为10.5m3/t 煤尘无爆炸性危险自然发火期为3-6个月 煤层顶底板较为稳定

采区工业储量为3369.2万t

5.1.3 采区生产能力及服务年限

采区生产能力的基础是采煤工作面生产能力

而采煤工作面的产量取决于煤层厚度、工作面长度及推进度

1)采区生产能力A:

(5-1)

式中:L-回采工作面长度 取180m

V-工作面年推进度 工作面每日进4刀 截深0.8m 因此年推度为1056m

M-采高 4m

r-煤的容重 1.3t/

C-工作面回采率 厚煤层0.93

则: A=180×1188×4×1.3×0.93

=90.92万t/a

同时考虑5%的掘进出煤 则采区的生产能力为:

A总= A×(1+5%)=103.4×1.05=95.47万t/a;

再将上面计算出来的生产能力通过通风能力、风速和风量限制要求计算式中检验 得出符合要求

2)采区服务年限T:

(5-2)

式中: Z-本采区设计可采储量 2351.16万t

A-本区生产能力 90万t/a

=2351.16/90×1.4=18.65年

5.2 采区形式、采区主要参数的确定 5.2.1 采区形式

按照煤层群开采的联系为联合准备 即各煤层共用两个岩石上山和区段石门 煤层倾角平均为14°

瓦斯量低、顶底板均无较大涌水 根据煤层赋存条件

本设计采用走向长壁采煤法

5.2.2 采区上山数目、位置及用途

设计的上山在最下部煤层的底板开掘 运输上山作为采区的主运输 其内铺设皮带

运输采区工作面的出煤

轨道上山铺设轨道作为采区的辅助运输 运送矸石、设备、材料、兼作行人

5.2.3 区段划分

采区倾向长1256m 其中留4m的区段平巷 区段间保护煤柱留10m宽 井田境界煤柱30m 阶段煤柱30m 则本采区可以划分为6个区段 工作面长180m

5.3 采区车场及硐室 5.3.1 车场形式

区段上部车场为顺向平车场 中部为单向甩车场 下部为直向平车场

每个采区只有一个综采工作面 运输量不大

所以只设材料绕道车场 运料斜巷在大巷入口处取平由大巷进入车场绕道存车线 然后直接进入轨道上山 这种布置方式使用方便 运行可靠

1)上部车场:车场形式为顺向平车场(与回风道在同一水平)矿车或材料车经轨道上山提至平车场平台

然后沿着矿车行进方向经回风石门运至工作面或所需材料地点

2)车场:车场形式为石门甩车场形式 单道起坡方式

由轨道上山提升上来的矿车 通过甩车道甩到中部轨道石门中 再进到区段轨道平巷

3)下部车场:本下部车场的绕道属于顶板绕道 从上山来看

通过竖曲线落平后摘钩

沿车场的高道自动滑行到下部车场存车线 由井底来车

则进入车场的底道

自动滑行到下部车场的低道存车线后 挂钩由绞车房提升上去

根据轨道上山起坡点到大巷的距离 本车场属于斜式顶板绕道 [8] 5.3.2 采区煤仓

在采区煤仓的尺寸确定之前 首先对煤仓的容量进行确定:

按循环产量计算煤仓容量Q

Q=L×l×h×r

式中:L--工作面长度 m

l--截深 m

h--采高 m

r--煤的容重 1.3t/ m3

所以Q =180×0.8×4×1.3=748.8t

由以上计算作为依据 选择煤仓容量为800t

由经验

R=2.96≈3 h=25m

采区煤仓用混凝土收口 在煤仓上口设铁箅子 煤仓溜口与装车方向相同 闸门的形式为单扇闸门 开启方式为气动

5.4 采准系统、通风系统、运输系统 5.4.1 采准系统

由运输大巷开掘采区下部车场 向上开掘采区岩石集中运输上山 采区集中轨道上山 与回风大巷贯通 形成通风系统后

在区段上部开掘采区回风石门

在区段下部开掘区段运输石门与区段轨道石门分别与上层煤贯通

在上层煤开掘区段运输平巷

5-4)5-3)((区段回风平巷至采区边界开掘开切眼 形成工作面即可回采

掘进过程中同时开掘中部车场 上部车场及采区各种硐室

5.4.2 通风系统

新鲜风流副井→井底车场→轨道大巷→轨道上山→区段运输平巷→工作面→污风→区段回风平巷→采区回风石门→回风大巷→风井排出地面

5.4.3 运输系统

运煤系统:工作面出煤→区段运输平巷→运煤上山→采区煤仓→运输大巷→井底煤仓→从主井提到地面;

排矸系统:掘进巷道时所出的矸石由轨道上山运到轨道大巷之后到井底车场 然后从副井提至地面;

运料系统:副井→井底车场→轨道大巷→轨道上山→区段回风平巷→使用地点 [6] 5.5 采区开采顺序

本设计采区同一煤层采用区段顺序依次开采 工作面沿走向推进 采区内共有四个煤层 分别都是由远及近开采 由于顶底板岩性较好

受采动影响较小.先采上层煤 再采下层煤

工作面沿走向推进

5.6 采区巷道断面

根据《设计规范》规定

综采工作面胶带输送机顺槽巷道净断面不宜小于12㎡ 回风顺槽净断面不宜小于10㎡

输送机上下山的净断面不宜小于12㎡ 运料、通风、和行人上山的净断面 不宜小于10㎡

采区准备巷道工程量是指从区段石门起的所有巷道和硐室的工程量总和 具体见下表5-1:

表5-1采区准备工程量

Tab.5-1 Ready engineering amount of mining section 巷道 支护形式 断面大小 长度/m 体积

净/m2 掘/m2

净/m3 掘/m3 运输上山 锚喷 16.4 20.2 1170 19188 23634 轨道上山 锚喷 15.3 19.0 1170 17901 22230 绞车房 锚喷 13.5 15 35 472.5 525 采区下部车场 锚喷 13.1 14.9 150 1965 2235 采区煤仓 混凝土 15.9 19.6 21 333.9 411.6 区段运输石门 锚喷 16.4 20.2 145 2378 2929 区段回风石门 锚喷 15.3 19.0 145 2218.5 2755 运输顺槽 梯形棚子 12.3 13.7 1430 17589 19591 回风顺槽 梯形棚子 11.6 13.1 1430 16588 18733 开切眼 锚网 10.1 10.1 180 1848.3 1848.3

图5-1.运输顺槽巷道断面图

Fig.5-1 Transport trough tunnel section

图5-2 回风顺槽断面及特征

Fig.5-2 Returns to the wind to break the chart along the trough and charactic 6 采煤方法

6.1 采煤方法的选择 6.1.1 选择的要求

1)煤炭资源损失少 采用正规采煤方法

2)安全及劳动条件好

3)便于生产管理

4)材料消耗少

5)尽可能采用机械化采煤 达到工作面高产高效

6.1.2 采煤方法

本矿井的两层煤均属于缓倾斜煤层 根据本采区的形状特点

采用走向长壁后退垮落采煤法

表6-1 全井田各采区采煤方法

Table 6-1 entire mining area of the mine mining method

采区

采煤方法

落煤方式

顶板管理

一采区

走向长壁采煤法

综采局部普采

全部垮落法

二采区

走向长壁采煤法

综采局部普采

全部垮落法

三采区

走向长壁采煤法

综采局部炮采

全部垮落法

四采区

走向长壁采煤法

综采局部炮采

全部垮落法

第三篇:采矿工程毕业设计

致谢

本论文是在指导老师关玉顺和廖军老师的悉心指导下完成的,在做论文期间,指导老师为我的学习和工作付出的大量的心血,在此论文完成之际,我对指导老师给予的指导和关怀,表示最忠心的感谢和最诚挚的敬意!感谢各位教授和老师认真审阅我的论文,敬请各位教授和老师批评指正!

第四篇:采矿工程毕业设计翻译(teniu推荐)

附录 外文翻译

APPLICATION OF BLASTING IN DRIVING TUNNEL 1 FRAGMENTATION Fragmentation is the breaking of coal, ore,or rock by blasting so that the bulk of the material is small enough to load, handle and transport.Fragmentation would be at its best when the debris is not smaller than necessary for handling and not so large as to require hand breaking or secondary blasting.Energy must be supplied to rock by direct or indirect means to fragment that rock and the type of loading system.Fragmentation energy is consumed by the main mechanisms:(1)creation of new surface area(fracture energy),(2)friction(plasticity)and(3)elastic wave enegy dispersion.The loading method determines the relative proportions and the amount of energy consumed in fragmenting a given rock type.Unonfined tensile failure consumes the least energy with an increasing a,mount of energy required as the rock is more highly confined within a compressive stress field during fragmentation The way energy is applied by tools to cause rock or mineral fragmentation is important in determining fragmentation efficiency.To best design fragmentation tools and optimize fragmentation systems it would be desirable to know how rock properties influence breakage.The strength of rock is influenced by the environmental conditions imposed on the rock.Those of most importance in rock are(1)confining pressure ,(2)pore fluid pressure,(3)temperature and(4)rate of load application.Increase in confining pressure, as with increasing depth beneath th earth's surface or under the action of a fragmentation tool, causes an increase in rock strength.Apparent rock strength decreases as porc fluid pressure increases, since it decreases the effect of confining pressure.Although chemical effects of pore fluids influence rock strength, they generally are small compared to the confining pressure effect, except for a small minority of rock types.Increase in rock temperature causes a decrease in rock strength.This effect is very small because of the small ambient temperature changes found during mining.An increase in rate of load application causes an apparent increase in rock strength.Rock exhibits directional properties that in fluence the way it breaks.These are embodied in the concept of rock fabric ,which connotes the structure or configuration of the aggregate components as well as the physical or mechanical property manifestations.Rock fabric ont only relates to the preferred orientation of mineral constituents and their planes of weakness, but also to the configuration of discontinuities, microcracks and pores.Joints and bedding planes have great influence on fragmentation at field scale.Physical properties of rock(density,indentation,hardness,abrasivehardness and porosity ,)are frequently used in conjunction with mechanical properties to develop better empirical esti mations of rock fragmentation.2 BLASTHOLE CHARGING METHODS Drill hole charging can be carried out in different ways depending on whether the explosive used is in cartridges or in the form of loose material.The oldest charging method implies the use of a tamping rod and this system is still used to a very great extent.During the last 20years, compressed air chargers have been used and these machines provide both good capacity and also an improved level of charge concentration so that the drill holes are utilized to a higher degree.During the last few years semi-automatic chargers have been taken into use, primarily in underground work.Compressed air chargers for blasting powder in the form of loose material have also come into use on a large scale.As far as slurry blasting is concerned, special pumping methods have been developed through which charging capacity in the case of large diameter drill holes is practically good.A tamping rod must be made of wood or plastic.It must not be too thick in relation to the drill hole diameter since this can crush and damage fuse or electric detonator cables during charging work.If a good degree of packing is to be obtained during charging with a tamping rod then only one cartridge at a time should be charged and tamped.The detonator must be correctly fed into the drill hole during charging work.Compressed air chargers have been in use is Sweden for about 20 years.The first type consisted of aluminum pipes connected together and the cartridges were blown into the hole with an air pressure of 42 pounds per square inch.since that time the charging tube has been replaced by anti-static treated plastic hose of a special design.A charger includes a foot-operated valve, reduction vavle with air hose, breech, connecting tube and charging hose.The semi-automatic charger permits the continuous insertion of explosive cartridge at the same rate as they are charged in the hole by the hose.Instead of a valve being used ,the cartridges pass through an air lock between two flaps.The air pressure in the charging hose is retained while cartridges are pressure in the charging hose is retained while cartridges are beins inserted.The semi-automatic charger permits considerably higher charging capacity than the normal type of charger.Explosives in the form of the form of loose material, usually ammonium nitrate explosives(ANFO), require special chargers.Two types can be differentiated: pressrure vessel machines and ejector units.Pressure vessel machines are particularly suitable for crystalline An explosives with good charging capacity.Ejector units are operate by an ejector sucking up explosive from a container through a charging hose.The explosive is then blown through the charging hose into the drill hole.There are, also combined pressure ejector machines.The charging hose used for ANFO charging operations must conduct electricity and have a resistance of at least 1KΏ/m and max.30KΏ/M.Nitro Nobel has developed a special pumping procedure which consists of a tanker vehicle which is used to pump explosive directly the drill holes.The charging capacity is very high in the case of large diameter drill holes.3 CONTROLLED BLASTING TECHNIQUTES

Controlled blasting is used to reduce overbreak and minimize fracturing of the rock at the boundary of an excavation.The four basic controlled blasting techniques are: line drilling, presplitting, cushion blasting and smooth blasting.Line drilling, the earliest controlled blasting technique, involves drilling a row of closely spaced holes along the final excavation line, providing a plane of weakness to which to break.Line drill holes, 2or 4 diameters apart and contain no explosive.The blastholes adjacent to the line drillholes normally are loaded lighter and are on closer spacing than the other blastholes.The maximum depth for line drilling is about 30 ft.Line drilling involves no blasting in the final row of holes, and thus minimizes damage to the final wall.Presplitting, sometimes called preshearing ,involves a single row of boreholes ,usually 2 to 4 in.in diameter ,drilled along the final excavation at a spacing of 6 to 12 borehole diameters.Dynamite cartridges 1to 1.5 in.in size on 1 to 2 ft.centers usually are string-loadde on detonating cord ,although special small-diameter cartridges with special couplers are available for total column loading.In unconsolidated formations ,closer spacings with lighter powder loads are required.The bottom 2 to 3 ft.of borehole usually is loaded somewhat heavier than the remainder.Stemming between and around the inpidual charges is optional.The top 2 to 3 ft.of borehole is not loaded ,but is stemmed.The depth that can bu presplit is limited by hole alignment ,with 50 ft.being about maximum.The presplit holes are fired before before the adjacent primary holes to provide a fracture plane to which the primary blast can break.In presplitting it is difficult to determine the results until the adjacent primary blast is shot.For this reason ,presplitting too far in advance is not recommended.Presplitting seldom is done underground.Cushion blasting involves drilling a row of 2 – to 6-in.diameter boreholes along the final excavation line ,loading with a light well-distributed charge ,completely stemmed and firing after the main excavation is removed rather than before ,as in presplitting.The burden on the holes is slightly larger than the spacing.Wedges may be used to abut the charges to the excavation side of the borehole and minimize damage to the final wall.Eeplosive loading is similar to that in presplitting.Cushion blasting has been done to depths near 100 ft.in a single lift with the larger-diameter boreholes because alignment is more easily retained.Cushion blasting seldom is done underground.Smooth blasting is the underground counterpart of cushion blasting.At the perimeter of the tunnel or drift ,closely spaced holes with a burden-to-spacing ratio near 1.5:1 are loaded with light well-distributed charges.Smooth blasting differs from cushion blasting in that(1)except at the collar ,the charges are not stemmed and(2)the perimeter holes are fired on the last delay in the same round as the primary blast.Total column loading is most common ,although spacers may be used.The holes are stemmed to prevent the charges from being pulled out by the detonation of the previous delayed holes.Smooth blasting reduces overbreak in a drift and also provides a more competent back requiring less support.It involves more perimeter holes than does normal blasting.Combinations of controlled blasting techniques are used.In unconsolidated rock,line drilling sometimes is desirable between presplit or cushion boreholes.Corners sometimes are presplit when cushion blasting is used.4 TUNNEL BLASTING The most common methed of driving a mining tunnel is a cyclic operation in three sequences:(1)Drilling shot holes;charging them with explosives and blasting.(2)Removing the resulting muck pile.(3)Inserting the tunnel linings into the newly excaved area;and advancing the ralls.ventilation arrangements, and power supplies ready for the next cycle of operations.The basic principle of tunnel blasting ,in its simplest term, is to loosen a volume of the virgin rock in such a way that when it is removed the line of the tunnel has advance in the correct direction with as nearly as possible the correct cross-section.The dilling pattern in which the holes to receive the explosives are drilled into the working face is designed so that :the holes are easy to drill;the minimurd total quantity of explosive is required;and the periphery of the space left after the blast conforms as nearly as possible to the required tunnel section.A blast round consists of cut ,relief, breast and trim holes.The cut portion is the most important.The objective of the cut is to provide a free face to which the remainder of the round may break.The two general types of cuts are the angled cut and the burn.These can be used in combinations to form various other cuts.Angled cuts are more advantageous than burn in wide headings ,due to the fewer boles and less explosive required per foot.A disadvangtage is the possibility of large pieces of rock being thrown from the ―V‖.The wedge or V-cut consists of two holes angled to meet or nearly meet at the bottom.The cut can consist of one or several Vs, either verticao or horizontal.For deeper rounds or hard-breaking rock ,double Vs can be used.The smaller is called the baby cut.It is useful in small headings.Large-diameter burn holes provide excellent relief in big headings.Burn cuts permit deeper rounds than angled cuts and , due to the increased advance per round ,may prove more economical.In burn cuts ,the holes must be drilled parallel , with proper spacing ,and 0.5 : 1 ft deeper than the remainder of the round.Usually ,one or more holes(large-diameter)are left unloaded to provide relief for the loaded holes.Various combinations of spacing ,alignment and holes loaded are possible.Innumerable typesofblastingrounds are used in underground headings.Even in the same heading the round may have to be altered as different rock charateristics develop.An important factor in any round is the firing sequence.In general ,the holes are fired so that each hole or series of holes is blasted to the free face provided by the preceding holes.The depth of drift rounds depends on the complete drifting cycle and drift size.A general rule is that a round will not break much deeper than the least cross-sectional dimension of the drift.Rounds can be arranged that provide certain muck-pile shapes and positions for more efficient loading and cycles.In drifts requiring close support , rounds can be arranged to prevent damage.爆破在井巷掘进中的应用 破岩理论

破岩是用爆破的方法把煤、矿石或岩石破碎,使大部分物料的块度足够小,满足装载、处理和运输的条件。碎块不要小到不便于装运,也不要大到需要手工破碎或二次爆破,这样的破岩才算最佳。

为了破岩,必须用直接或间接的方式向岩石施加能量。能量的大小取决于岩石的性质和装药系统的类型。消耗能量的主要机理有:(1)形成新的表面(破岩能量);(2)摩擦(塑性);(3)传播弹性波能。

上述方面的相对比例和所消耗的能量决定于装药的方法和需破碎岩石的性质。无约束时岩石拉伸破坏所消耗的能量最少,在破岩过程中如岩石受到较高的压应力场的约束时,破岩需要能量有所增加。用机械传递能量使岩石或矿石破碎的方法,对于决定破岩效率十分重要。为了设计出最好的破岩机器和最佳的破岩系统,需要尽可能地弄清楚岩石性质是如何影响破岩的。

岩石的强度受到周围环境的影响,其中最重要的因素是:(1)约束力;(2)空隙中的流体压;,(3)温度;(4)加压的速度,约束力的增加(如随着高地表深度的增加或在破岩机具的作用下而使其增加),使严石的强度增加。随着孔隙流体压力增加,岩石的视强度就降低

因为它减弱了约束力的作用。虽然孔隙流体的化学作用对岩石的强度有影响,仅和约束力作用比较,除少数几种岩石外,一般都比较小。岩石温度的增加使岩石的强度降低。但这种效应非常小,因为采矿的时候周围温度变化小。加压的速度增加,使岩石强度显著增加。

岩石具有影响其破碎方式的方向性。这体现在岩石的结构上,包括集合岩石组分的结构或形状以及岩石的物理特性或机械特性岩石的结构不仅与矿物组分的方向及其薄弱面有关,而且与其非连续性、微观裂隙和孔隙 的构造有关。在现场,节理和层理对破岩有很大影响。人们经常综合利用岩石的物理性质(密度、压痕,硬度、磨蚀硬度、孔隙度)和机械性质,来谋取更好的破岩效果。2 装药方法

炮眼装药的方式可根据所采用的炸药是药卷或散装而有所不同。最古老的装 药方法是用炮棍装药,这种方法至今仍广泛使用。在过去二十年中,压风装药器已被采用,这些装药器既提高装药效率,同时又改进装药密度,因此炮眼的利用率较高。近几年来采用了半自动装药器,主要用于井下作业。装填散装药的压风装药器也已大规模地投入使用。就浆状炸药而论,已发明了一些专用的泵送方法,这种方法对于大孔径炮眼的装药能力实际上是很高的。

炮棍必须用木或塑料做成。但炮棍与钻孔相比不能做得太粗,因为这在装药作业中有可能捅坏和损坏导火索或电雷管脚线。用炮棍装药时,若想装填得好,那么一次只能装填并捣实一个药卷。装药时雷管必须送到炮眼中的准确位置。

压风装药器在瑞典已使用了大约二十年。第一种装药器由几节铝管连接而成并用42磅/英寸2的压风把药卷吹入炮眼。后来这种装药管由专门设计的经抗静电处理的塑料软管所代替。一台装药器包括脚踏阀,带风管的减压阀、分风管、连接管和装药软管。

半自动装药器可连续装填药卷,其装药速度与软管装药速度相同。这种半自动装药器不用阀门,而是让药卷通过一个位于两个闸门之间的气室。装药时装药钦管中的风压不变。半自动装药器的装药能力比普通的装药器高得多。

散装炸药一般为硝铵炸药(铵油炸药),需要专用装药器。有两种不同的装药器:压力罐式装药器和注药器。压力罐式装药器特别适用装填结晶的销铵炸药,其装药能力较高。注药器的操作是用一个喷射器经—很软管把炸药吸出,然后再通过这根装药软管将炸药吹入炮眼入。还有一些由压力罐和注药器组合的装药器。装填铵油炸药的装药软管必须能导电,其电阻最小为1千欧米。最大为30千欧米。

奈特罗诺贝尔(硝化诺贝尔)公司曾创造一项专用泵送炸药的工艺,它包括一台直接把炸药泵入炮眼的槽车。向大直径炮眼装药时其装药能力极高。3 控制爆破

控制爆破用于减少巷道超挖和使围岩震裂减至最小程度。摔制爆破的四种基本方法是:轮廓线钻眼法、预裂爆破法、缓冲爆破法和光面爆破法。

轮廓线钻眼法,是最早的控制爆破法,这种方法是沿巷道(最终)轮廓线打一排紧密相邻的钻眼,形成一个有利于破碎的薄弱面。布在轮廓线上的钻眼直径为2英寸或3英寸。眼距通常相当于2~4个炮眼直径,不装药。靠近轮廓线钻眼的 炮眼,起装药量及眼距均比其他炮眼小。轮廓线眼的最大深度大约为30英尺。由于轮廓线钻眼法的最后一排眼不爆破,因而对岩壁的破坏最轻。

预裂爆破,有时又称为预剪切爆破,是在巷道的轮廓线上钻一排炮眼,其直径一般为2至4英寸眼距为炮眼直径的6~12倍,显然市场上可买到柱状装药所需的小直径药卷和专用的连接器,但一般仍采用直径为l—11/,英寸的代那买特药卷,间隔装药,药卷间隔为1~2英尺,以导爆线串系起来。在松软岩层中,要求眼距小—些,装药量少一些。眼底2~3英尺处的装药量略比其余部分要多一些。单个药卷之间及其周围是否充填炮泥可随意确定。孔口2~3英尺处不装药,但要充填炮泥。预裂爆破的深度受炮眼排列的限制,最大深度约为50英尺。预裂炮眼比邻近主炮眼先起爆,以形成有利于主炮眼爆破的裂面。预裂爆破中在邻近主炮眼爆破之前很难判断其效果。因此建议预裂的超前距离不要太大。预裂爆破很少在井下使用。

缓冲爆破法是沿岩道轮廓线钻一排直径为2~6英寸的炮眼,眼中装入均匀分布的小药卷,完全堵满炮泥,起爆顺序与预裂爆破不同,要在主炮眼起瀑之后周边眼才爆破。炮眼的最小抵抗线(光爆层厚度)略大于眼距。可利用楔子把药卷固定在眼中靠近爆破自由面一侧,以减少爆破对岩壁的损坏。这种方法的装药方式与预裂爆破法相似。因为钻大直径炮眼容易准直,所以缓冲爆破法采用大直径炮眼时一次爆破深度以达一百英尺。但缓冲爆破在井下很少使用。

光面爆破法就是井下的缓冲爆破法。巷道周边的密集炮眼的光爆层厚度(周边眼的抵抗值)与眼距之比L接近1.5:1。周边眼中装上分布均匀的小药卷。光面爆破与缓冲爆破的区别在于:(1)除炮眼口外,药卷不用充填炮泥;(2)周边眼在一茬炮眼中最后一段起爆。虽然药往中也可采用间隔物(间隔装药),但最常用的是柱状装药。孔底装药量稍多一些。炮眼均填以炮泥,以防止(在延期爆破中)光爆炮眼爆轰时将药包带出。光面爆破减少巷道的超挖,增强围岩稳定性并减少支护量。但比普通方法需要多钻一些周边眼。

各种控制爆破方法可结合使用。在松软岩石中,有时需要轮廓线钻眼方法与预裂法或缓冲爆破法结合使用。当采用缓冲爆破法时,有时需要在转角处用预裂法爆破。4 井巷爆破

最常用的岩巷掘进方法是三个工序的循环作业:

(1)钻炮眼、装炸药和爆破。

(2)装岩(将爆破的岩堆装运出去)。

(3)安装支架,支护刚掘出的巷道,敷设接长轨道、风管和电缆,为下个循环作好准备工作。

简而言之,岩巷爆破的基本原则是,把岩体上一部分岩石破碎下来,当装走爆落的岩石后,巷道按正确的方向前进,其断面尽可能地接近设 计断面。

炮眼布置设计要做到:便于钻跟,耗用炸药最少,爆破后所形成的巷道断面尽可能接近设计要求。

一组炮眼由掏槽眼、扩槽眼、辅助眼和周边眼组成。掏槽眼最重要。掏槽眼的作用是为炮眼组的其他炮眼提供一个自由面,便于爆破。

常用的两种掏槽方式是斜角眼掏槽和直眼掏槽。这两种掏槽方式可以联合组成其他各种掏槽方式。在较大断面巷道中,斜角眼掏槽比直眼掏槽优越,因为炮眼数目少掏,每掘进一英尺巷道所需炸药量少。其缺点是“v”形掏槽有可能抛出大块岩块。

楔形掏槽或v型掏槽内成对的斜角炮眼在底部相遇或接近相遇组成。楔形掏糟可由一个或几个v型槽构成垂直或水平楔形掏槽。对于深度较大的炮眼或难于爆破的岩石,可采用复式楔形掏槽。较小的掏槽称为小槽。它适用于小断面巷道。

大直径掏槽直眼在大断面巷道中可为良好的扩槽创造条件。采用直眼掏槽,炮眼组的深度可比斜眼掏槽大一些,因为每茬炮的进度增加了,证明其更为经济。直眼掏槽的槽眼要平行,眼距要适当,其深度要比其他炮眼深1/2~1英尺。一般有一个或一个以上槽眼(大直径眼)不装药、为其他装药槽眼提供自由面。槽眼间距,布置及装药槽眼可采用各种组合形式。

井下巷道掘进中炮眼布置有无数种。甚至在同一巷道中,随着岩石性质的变化也要改变炮眼布置。对任何一组炮眼来说,重要的因素是爆破顺序。一般来说,炮眼引爆的顺序应使每个炮眼或一组炮眼随前一响炮眼所形成的自由面爆破。每茬炮的深度取决于整个掘进循环和巷道的断面尺寸。一般规律是,一茬炮的深度不要超过巷道最小断面尺寸太多。炮眼布置要使爆破下来的岩石堆的形状及位置 有利于更有效地装运和循环作业。对用需用密集支架的巷道,炮眼布置要能够预防破坏。

第五篇:采矿工程本科毕业设计英文翻译

Use of Mineral Coal for Sorption Sewage Treatment

A.V.Mozolkova Russian University of People’s Friendship.Moscow, Russia E.V.Chekushina Russian University of People’s Friendship.Moscow, Russia A.A.Kaminskaya Russian University of People’s Friendship.Moscow, Russia

Treatment of mining, industrial, household and other sewage is an actual problem for many mining and processing enterprises.Coal-mining industry is not an exception.Usually, at coal enterprises, treatment of mine sewage before it is dumped consists in settling and subsequent filtering.Many pollutants are not removed from the sewage by this method.Hence, dumped water frequently does not satisfy sanitary requirements regarding the permissible content of oil products, dissolved substances and other parameters.For additional cleaning of sewage it is possible to use sorption methods.By these methods water is cleaned of oil products, heavy metals, a number of organic substances and other polluting substances, depending on the used sorbent properties.Both natural and artificial materials can be used as sorbents.Constraint for wide use of sorption methods of sewage treatment in the coal industry is high cost of the majority of sorbents.A number of technologies for obtaining inexpensive and good quality sorbents from coal minerals have been developed.These sorbents can be manufactured directly in coal mines which has additional advantage of reducing transport costs.The processes sorbents may be recycled or burnt.Apart from that production and sale of sorbents can serve the coal-mining enterprises as an additional source of income.One of the most widespread sorbents is activated coal.Quality activated coals are carbon sorbents, having an internal specific surface of more than 500㎡/g, and characterized by iodine adsorption(iodine value)of more than500mg/g.mineral coal, peat and wood can serve as raw materials for activated coal production.Traditional production techniques of activated coal include two basic stages of thermal processing of the initial carbon-containing raw material-carbonization and activation, done in different devices.Both stages are energy-consuming and ecologically dangerous, which explains the high cost of activated coal, received through this technology(1200-4000 dollars/MT).Carbonization is the elimination of volatile substances by heating up to the temperature of 600-900℃, because with volatile components there are basically formed the oxygen and hydrogen, and increase carbon content in initial raw material.Carbonization is done in mining or rotating furnaces with utilization of external form-holder, as a rule, waste gases with temperatures of 600℃ and higher.Activation means increasing the volume and pore surfaces of carbonized material at heterogeneous reaction.The most used reagent is water vapour with the temperature of 900℃ and higher, and the process takes 15-20 hours.Both stages are energy consuming and pose threat to environment.For one tonne of activated coal from 2 up to 4 tonnes of specific fuel like crude oil and natural gas are consumed.From 1000 up to 1500 m³ of processed gasses with high content of SOx(1-2 g/ m³), H2S(200-250mg/ m³), resinous substances(10-40mg/ m³), phenols(50-70mg/ m³), carbon oxides(up to 5%)and also other substances which are carcinogenic and mutagenic are formed and released into the atmosphere during both stages.High-energy consumption and environmental danger, which requires large investments in nature protection activities, result in the high cost of quality-activated coal.Another group of carbon sorbents, which was widespread in the 80’s, consists of inexpensive carbon sorbents used in nature protection technologies and industry.Such sorbents are produced by a one-phase technology, without additional activation.Their adsorption activity is not high(iodine value less than 300mg/g)but the cost is low(250-700 USD/MT).because the price of these sorbents is comparable to the cost of their regeneration, they are used only once and are burnt after saturation.The leaders in the production of such sorbents are Rheinbraun AG(Germany, 200 thousand MT per year)and Australian Char Ltd(Australia, 150 thousand MT per year), which produce brown coal semi-coke used for treatment of wastewater and smoke.In Russia research work in this direction is conducted, but only test works have been done so far, although the quality of carbon sorbents obtained from Kansk-Achinsk coals did not concede to production from Rheinbraun AG and Australian Char.One of the directions of utilization of semi-coke from Kansk-Achinsk coals, production of which was planed at Krasnoyarsc thermal power station 2(device ETX-175), was its utilization as carbon sorbent.The reason for production of inexpensive carbon sorbents by one-phase technologies being not developed in Russia is the absence of demand for this product.This production is basically used for cleaning of sewage, however there is no effective ecological service in Russia, and the penal sanctions of the environmental protection legislation are so insignificant that industrial enterprises do not have ant motivation to invest in nature protection.In1992-1994 the employees from Joint-Stock Company “Carbonica-F”(at that time Open Company “Sibtermo”)have developed a new method of production of carbon sorbents, which considerably from all known technologies.During the research of dynamic effects in a layer evaporator the regime conditions were defined under which the effect of “thermal wave” could be observed in the device.Using this effect, the authors created a layer evaporator in which volatile components of coal were exposed to gasification(incomplete oxidation), and the degree of carbon conversion was adjusted by the mode of injection feed.By changing the regime parameters it was possible to conduct the process as fuel gasification(with only ashes remaining in the end)without any residue, and also as gasification of volatile components of coal, thus receiving so-called semi-coke containing solid coal.From one tonne of Kansk-Achinsk coal with calorific content of 3600-3800 kcal/kg can be produced about 0.33 tonnes of semi-coke with calorific content up to 7000 kcal/kg(as anthracite)and up to 1700 m3 of combustible gas with calorific content of 800-900 kcalJm3, suitable for use as an energy source.Technological process of Joint-Stock Company “Carbonika-F” has a large number of advantages in comparison to the already known methods of obtaining activated coal and semi-coke

1.Simplicity of hardware.One-phase process.The stages of drying, pyrolysis, thermal decomposition of volatile substances and semi-coke cooling are incorporated in one device.The device is auto-metric;it means that external heat-carrier for coal heating is not used.2.Ecological safety.In the technology of Joint-Stock Company “Carbonica-F” all hydrocarbons, including resinous substances, are broken down and gasified inside the device during the formation of combustible gas containing only CO, H2, CO2, N2, H20, H2S and insignificant quantity CH4.Sludge, pyroligneous waters, phenols and other harmful impurities are not formed in this process.3.Because the speed of gas filtration from a layer reactor is low(0,02-0,03 m/s in comparison to 0,5-2,5 m/s for mine furnaces), the process is less dependent on fractional composition of coal, hydraulic resistance of the layer and allows to process fine-grained coals.4.As a result of low speed of filtration the phenomenon of carrying out of fly ashes from the layer does not occur, because the device works as a granular filter.Combustible gas is moved in user-boiler or can move to the gas turbine without preliminary cleaning.The volume of SOx, NOx, CO contained in waste gases is lower than that produced when obtaining equivalent quantity of heat by burning coal.Combustible gas without prior cleaning can be used to produce electric and/or thermal power or as an energy carrier for thermal processes.5.Unlike the already existing technologies, in the given process there is no dump(排空孔)of gaseous heat-carrier(气体热载体)into the atmosphere and consequently(因此)the construction of other additional gas purification systems(更多的天然气净化系统工程)and catalytic burning of carbon oxide(CO)(催化燃烧的碳氧化物)is not required.与现有的技术不同,在以上给出的过程呢个中,没有气体热载体排放的到空中的排空孔,因此,更多的天然气净化系统和催化燃烧的碳氧化物的工程是不必要的。

Test of the solid residue(semi-coke)have revealed, that this material is characterized by large specific surface(more than 500㎡/g)and high adsorption activity(iodine value 500mg/g and higher), and because of these parameter does not concede to quality-activated coal.经过试验的固体残渣(半焦)表明:这种材料的特点是表面积大(大于五百平方米)并且有很强的吸附性(碘值是500毫克每克甚至更高)而且因为这些参数并不退让与高质量的活性炭。

The product received with the technology of Joint-Stock Company “Carbonica-F” is certificated as activated coal ABG(active, brown coal of gasification), for it there were developed technical conditions TU 6-00209591-443-95.The characteristics of ABG activated coal produced from the coal of 62 mark from “Berezovsky-1” opencast colliery.获得技术联合股份公司“Carbonica-F认证的产品被认证为ABG类活性炭(就是具有活性的棕色的气化煤)为此,在此基础上又发展了TU 6-00209591-443-95技术条件。ABG活性炭的特点来自于出产它的来自”Berezovsky-1“露天煤矿的62号煤。

High specific surface and adsorption activity of ABG coal is explained by the fact that both gasification of coal volatile components, and activation of carbon-containing solid residue of gaseous products occur in the device simultaneously.Because gasification products contain up to 20%n of hydrogen whose molecules are smaller than the ones of water vapour, and hence their permeability in pores of semi-coke is higher, activation(heterogeneous reaction)is done not only with vapor, but also with hydrogen, which practically is not present in the traditional technologies.Thus, carbonization stages and activation are combined in one device.气化煤挥发性成分和激活含碳固体残留气体产品同时在装置上发生的事实就解释了ABG煤的高比表面积和强大的吸附特性。因为气化产品包含了20%以上的氢,而这些氢分子比那些水蒸汽要小一些,因此他们在半焦气孔的渗透率就高一些,激活(异构反应)就完成了,不仅与蒸汽,还与氢,而这些实际上是传统技术中不存在的。因此,碳化阶段和激活是在同一装置中同步进行的(相结合的)。

Other positive effect of application of this method of coal processing is that in ”thermal wave“ mode the products of thermal decomposition which contain very toxic resinous substances(coal tar pitch used in experimental medicine for the inoculation of cancer in experiments on mice, brown coal is more toxic), passing through a hot layer of semi-coke(500-700℃)are completely broken down into two and three-nuclei gases H2O, CO2, CO, H2.Measurements done at the working production plant of Joint-Stock Company ”Carbonica-F“ have shown that the gas does not contain hydrocarbons of lines above methane, and also carcinogens, including benzo(a)pirene.其他应用到这种方法的积极效果是在“热波”模式中产品的热分解含有剧毒物质的树脂(煤沥青用于实验医学的接种癌症的实验小鼠,褐色碳毒性更强。)经过一个半焦的热层(500到700摄氏度)完全分解成双核或三核气体:水,二氧化碳,一氧化碳,氢气。测量工作在”Carbonica-F“联合股份公司的工作生产厂完成,这表明了这种气体不仅包含了碳氢化合物甲烷以上的行,也包含了致癌物质,包括:

Cooling of the activated coal from 550 up to 70℃ before discharging is carried out by compulsory circulation of gaseous heat-carrier(waste gases)through a layer of the product and further through shell-and-tube heat exchanger in which water used in closed circuit is also provided.Total process efficiency reaches 95% due to the high degree of utilization, which is associated with utilizing the thermal energy.在把活性炭从高于550摄氏度冷却到70摄氏度的过程以前,Departing waste gases do not undergo any cleaning;there are even no cyclones.Nevertheless, the content of harmful mixtures(NOx 150 mg/m3, SOx 50 mg/m3, ash less than 10 mg/m3)is essentially lower than the established norms and parameters of working boiler and thermal power stations, even those equipped with modern multistage systems of gas purification including electro filters.This is explained by a insignificant ablation of ash from devices, sorption of sulfur compounds in activated corner, and also focus temperature from the user-boiler is lower than 1600℃-“threshold(” 阈值)temperature at which begins the formation of nitrogen oxides due to the oxidation of nitrogen from the air.汽车尾气不经过任何清理,也没有分离器。然而,有害混合物的含量(NOx 150 mg/m3, SOx 50 mg/m3,含灰尘少于10 mg/m3)实质上比规定和工作锅炉和热电站的参数都要低。甚至是那些配备了现代化多级系统的气体净化过滤器。这是用来自仪器燃烧产生的毫无意义的灰尘来解释的,硫磺混合物的吸附作用在激活的一角进行,并且也把用户锅炉法制温度低于1600℃作为重点,而这个温度是空气中的氧化氮形成氮氧化物的开始。

The technology of Joint-Stock Company ”Carbonica-F“ can be used for any not conglomerating coals.”Carbonica-F“联合股份公司的技术可以被用在任意的非聚合煤上。

Similar sorbents or slightly conceding in quality to activated coal are formed by semi-coking of unconglomerated coal.Semi-coke received by using the technology developed and patented at Joint-Stock Company ”Carbonika-F“ is characterised by large specific surface(above 500 m2/g)and high adsorption activity(iodine value 500 mglg and more), and with these parameters does not concede in quality to activated coal.The production of this sorbent is ecologically safe.The producon by-product-combustible gas can be burnt in boilers of thermal power station.类似的吸附剂或是质量稍微差一点的活性炭油由聚合碳的半焦形成。半焦被使用该技术发展和专利的”Carbonika-F"联合股份公司使用,特点是表面积大(大于500平方米/ g),和高吸附活性(碘值500 mglg等)而且这些参数不会影响到活性炭的质量。生产这些吸附剂是具有生态安全性的。产品的副产品会在热电站的锅炉里被燃烧。

Some mineral coals(called mesoporous)have internal pores accessible to water, having the size 3.5-4 manometers(mesopores), forming active surface, sized 50-120 m2/g(unlike all other natural coals with surface of 0.5-1 m2/g).These coals can be used as sorbents without additional activation.They clear water of undissolved and dissolved mineral oil, deep dispersing mixtures, iron, phenol, ions of heavy metals, ammonia, nitrates, benzo(a)pirene and so forth.Sorbent MIU-S received from poorly metamorphosed mesopore coal can be used for 3-7 years with periodic regeneration.Alkali regeneration solution is removed from the fitter without other additional neutralization, because in alkali and acid medium MIU-S presents buffer properties, neutralizing these media.一些矿产煤(叫做孔)有内部吸水孔,面积在50-120 m2/g(不像其他自然界的煤表面积是0.5-1 m2/g)。这些煤无需激活就可以被用作吸附剂。他们可以清理不溶水和融化的矿物油,深层分散混合物,铁,酚,重金属离子,氨,硝酸盐,苯等等。MIU-S吸附剂来自劣质变形孔煤,可以在定期更改新的情况下用3-7年。碱再生解决方案从管工上移除而没有其他而外的失效,因为酸和碱的中介MIU-S存在缓冲性能,能够中和这些媒介。

Specific porous structure of mesopore coals assures sorption extraction of dissolved mineral oil products with concentration lower than 1 mg/l, and thus is not always reachable even with activated coals.具有特殊渗透结构的孔酶能够吸附提取溶解浓度低于1毫克/升的矿物油产品,因此并非总是能获得活性炭。

Using MIU-S filters in drinking water supply systems made the stability of their work in conditions of continuous exploitation evident, maintaining the properties of sorbents at null and sub-zero temperatures and absence of biomass formation.使用MIU-S filters在饮水供应系统中使用MIU-S filters可以使系统工作具有稳定性。可以为储蓄开采创造条件,保证吸附剂在零度或是零下温度条件下都可以持续进行且没有生物的形成。

Besides the abovementioned technologies, sorbents can be obtained from material coal by its briquetting and activation.Raw mineral for briquettes can be coals of any rank.除了上述提到的技术,吸附剂可以从矿物煤中通过成型和活化获得。制作煤球的矿物原料可以是任何一种煤。Thus , sorbents suitable for additional cleaning of sewage are possible to be produced from mineral coals by special processing, and sometimes directly.Production of own sorbents may solve the problem of additional cleaning of sewage in coal enterprises.Mesopore coals can be used as sorbents without additional processing;the other coals need additional activation.The studied sorbents can be used for cleaning sewage water from mineral oil products, organic substances and metal ions.因此,适合附加清洗下水道里的)污物的吸附剂可以通过特殊处理从矿物煤中得到,并且有时候是可以直接得到的,不需要特殊处理。制作自己的吸附剂可以解决煤炭企业附加清洗污水的问题。有孔煤不经过额外的处理就可以直接被用作吸附剂;其他的煤需要额外的处理才行。吸附剂的研究能被用于矿物油产品,有机物质和金属离子的污水处理中。

REFERENCES Kovaleva LB., Matvienko N.G., Solovyeva E.A., Tarnopolskaya M.G.: The Application of Natural Mineral Coal in the Technology of Sewage Treatment from Mineral Oil.World n Mining Ecology.Works of the Congress 1999, pg.310-315.2.Congress o For the preparation of the article have been used materials from the site www.teniu.cc.ru, www.miu-sorb.ru

采矿工程毕业设计(全文5篇)
TOP